Docsbench

AI workspace for preconstruction and estimating teams.Go Into Bid Day With Every Scope Covered.

Docsbench AI agents read the tender package and every subcontractor quote, level each trade against your scope sheets, and build the bid basis, clarifications, and proposal before the deadline.

  • Every quote leveled
  • No silent scope gaps
  • Late addenda handled
Get Early Access
Jump to

Your Bid. One Workspace.

Bring the project manual, drawings, addenda, bid forms, subcontractor quotes, takeoff exports, scope sheets, and past bids into one project. Docsbench’s agents read across all of it, so every requirement, quote, and change is in one place when the deadline arrives.

Read and classify

Know Every Requirement Before the Quotes Come In.

Docsbench reads the full project manual, drawings, and bid documents, sorts every requirement by trade package, and keeps the page reference for each one. Unusual commercial terms and requirements that could fall between trades are flagged before anyone prices the job.

Requirements Register.xlsx
980 pages1,604 requirements21 trade packages5 terms flagged
  • Div 01Liquidated damages $1,800/day

    CommercialFlagged
  • 09 30 00Tile: 3% attic stock

    Flooring
  • S-201 / 6Special inspection of anchors

    ConcreteDrawing
Analysis

Level Scope, Not Just Price.

Quotes arrive as PDFs, emails, spreadsheets, and scans, each worded differently. Docsbench maps every line to your scope sheet and marks each item as included, excluded, allowance, alternate, unclear, or not priced. The bidder’s original wording and quoted amount stay beside your adjustments, so you see the real low bidder.

Leveling Workbook.xlsx · Glazing
ScopeBidder 1Bidder 2Bidder 3
StorefrontIncludedIncludedIncluded
SealantsExcludedIncludedIncluded
Door hardwareIncludedAllowanceIncluded
MockupNot pricedIncludedUnclear
Quoted$842k$856k$879k
Adjusted$871k$856k$879k

Adjusted low: Bidder 2, though Bidder 1 quoted lowest

Revision

Take the Late Addendum in Stride.

An addendum two days out. A revised quote at 11 a.m. A bidder who withdraws. Tell Docsbench what changed, and it updates the leveling, the clarifications, and the bid summary, flags the quotes that no longer match the documents, and shows what moved.

Addendum 4: door hardware moves to Division 083 files updated
Leveling Workbook.xlsx · Door hardware
Carried in06 Carpentry08 Openings
Clarifications.docx · Item 12

Finish hardware is included in Division 08 per Addendum 4, with keying by the owner.

Bid Summary.xlsx · By division
08 Openings$1,412k$1,598k

Built for Every Part of the Bid.

From the first read of the tender to the proposal for negotiated work, each part of the bid has its own documents and its own deadline. Choose the work you want to see.

Compare Every Bidder on the Same Scope.

  • “Pull the roofing, glazing, and drywall quotes from these emails and PDFs into our scope sheets, keeping each bidder’s original wording.”

  • “Mark every item as included, excluded, allowance, alternate, unclear, or not priced, and show the adjusted low bidder for each trade.”

  • “Two quotes came in after Addendum 3. Check which bidders priced it, and update the leveling.”

Spend bid week deciding who to carry, not retyping quotes into spreadsheets.

Scope Gap and Follow-Up List.docx.docx

Bidder C · 2 items

Firestopping excluded · insulation not priced

Leveling Workbook.xlsx · Drywall.xlsx
$kABCD
Metal framingIncl.Incl.Incl.Incl.
Board and finishIncl.Incl.Incl.Incl.
FirestoppingIncl.Incl.Excl.Incl.
InsulationIncl.Allow.Not pricedIncl.
Quoted2,1402,0651,9802,210
Plugs+134
Adjusted2,1402,0652,1142,210

Adjusted low: Bidder B · firestopping plug carried for C

Illustrative example · fictional bids and figures
  • Excel.xlsx

    Leveling Workbook. One sheet per trade: bidders side by side, status for every scope item, quoted and adjusted totals.

  • Word.docx

    Scope Gap and Follow-Up List. What each bidder left out or left unclear, ready for the calls before bid day.

Editable Word documents. Excel workbooks. PowerPoint decks, with editable charts. Open the files, check the work, and keep refining.

The Number Stays Yours.

Does Docsbench do quantity takeoff?

No. It reads drawings to find requirements, notes, and details, and works with the quantities from your takeoff or estimating system exports.

Can it handle quotes in any format?

Yes. PDFs, emails, spreadsheets, and scanned quotes all go into the same leveling, mapped to your scope sheets and cost codes.

How does it keep our adjustments separate from bidder prices?

Each bidder’s quoted amount and original wording stay unchanged. Plugs and adjustments sit in their own columns, labeled with the instruction behind them.

Does it work with our estimating and bid-management tools?

Bring exports from your estimating, takeoff, and bid-management systems. Docsbench works with the files you upload, alongside the tools you already use.

Who decides the number?

You do. Estimators choose the bidders to carry, set the plugs and markups, and sign the bid. Docsbench prepares and updates the work under your direction.

Bid More Work With the Same Team.

Spend less time reading tenders, retyping quotes, and rewriting clarifications after every addendum. Give your estimators more time to price the risk and pick the jobs worth winning.

Get Early Access